Newsletter #11 2025

The concrete slabs in front of house 457 on Julio Berdegué Aznar, were repaired following a water leak repair; the process involved the following steps: the existing slab was demolished, the area was backfilled and then compacted to prepare the base. The surface was leveled. Finally, the area was covered with hydraulic concrete, to create […]