{"id":31,"date":"2018-01-31T09:51:44","date_gmt":"2018-01-31T09:51:44","guid":{"rendered":"https:\/\/uccid.com\/2018\/01\/31\/january-18\/"},"modified":"2025-06-11T23:39:37","modified_gmt":"2025-06-11T21:39:37","slug":"january-18","status":"publish","type":"post","link":"https:\/\/uccid.com\/en\/2018\/01\/31\/january-18\/","title":{"rendered":"Newsletter January 18"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\" size-full wp-image-30\" style=\"margin-left: auto;margin-right: auto\" src=\"https:\/\/uccid.com\/en\/wp-content\/uploads\/sites\/2\/2018\/01\/mantenimiento.jpg\" alt=\"mantenimiento\" width=\"300\" height=\"300\" srcset=\"https:\/\/uccid.com\/en\/wp-content\/uploads\/sites\/2\/2018\/01\/mantenimiento.jpg 500w, https:\/\/uccid.com\/en\/wp-content\/uploads\/sites\/2\/2018\/01\/mantenimiento-300x300.jpg 300w, https:\/\/uccid.com\/en\/wp-content\/uploads\/sites\/2\/2018\/01\/mantenimiento-150x150.jpg 150w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>Road Patching<\/strong><strong>:<\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">In the month of January 2018, several cobble stone and stone pavers patch works were done due to sinking and water leaks, such as in front of homes 265 and 289 at Calle Do\u00f1a Ximena, as well as at Do\u00f1a Sol in front of homes 211-C, 241 and 252; at Calle Santa Gadea by home 387; on Calle Jos\u00e9 Ram\u00f3n Fuentevilla by homes 1255, 1262 and 1269; in front of home 102 at Julio Berdegu\u00e9 Aznar Loop and at Calle de La Tizona by home 641.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>Other Works and Repairs<\/strong><strong>: <\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">On Calle de La Tizona at Villas Alhambra, a damaged and cracked area of approximately 45 m2 of the road was repaired.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">On Julio Berdegu\u00e9 Aznar Loop, at homes 108 and 109, a damaged and cracked asphalt stretch of the road was demolished and replaced with new concrete.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">At Costa Andaluc\u00eda, by Puerto de C\u00e1diz, lot 1842, a storm drain was built so the rain may flow towards the docks.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>Public Lighting \/ Electric System. <\/strong>Maintenance to reflectors and lampposts at the following sites:<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">Electric maintenance and repairs at the guardhouses and common areas of the residential complexes, as well as to the residential development\u2019s lampposts.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">An electric fault found in the public lights at Calle L\u00e1zaro C\u00e1rdenas at homes 1534 was repaired; at home 516 on Calle de La Colina new cabling was installed and a lamppost power box was repaired.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>Paint Works:<\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>&nbsp;<\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">Paint work done at the following areas:<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">The light metal posts and concrete bases.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">A section of the perimeter wall on Julio Berdegu\u00e9 Aznar Loop from home 313-Bis to home 330.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">The asphalt street bumps on Julio Berdegu\u00e9 Aznar Loop at Marina Plata and Villas Porto Cervo and at home 65.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">The guard houses at the Corporate Office, the Club House and El Toreo.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>Cleaning of Lots and Garden Areas.<\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>&nbsp;<\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">Gardening, cleaning done on private lots, streets, median and roundabouts. Particularly the lots of the second section of Vivar, Andaluc\u00eda on Calle Sevilla by the Marbella Residential, as well as the medians at Avenida S\u00e1balo &#8211; Cerritos and Julio Berdegu\u00e9 Aznar Loop at Calle Gral. L\u00e1zaro C\u00e1rdenas del R\u00edo, Tom\u00e1s de Rueda and Marina across from the suppliers\u2019 guardhouse, the lots, medians and gardens at Costa Brava and Vivar. The trees and palms at the planters at Calle Sevilla in front of the condominiums and Villas Santa Mar\u00eda and the medians, were trimmed and pruned.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>Inspection at the Marina Area:<\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\"><strong>&nbsp;<\/strong><\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">On Saturday mornings the inspection of the Marina canal starting at the Villas Puerto Espa\u00f1a dock, was carried out; this inspection included overall appearance, &nbsp;such as the paint right at the edge between the wall and inner harbor\u2019s stone wall, cleaning of the main canal, identifying the private docks that need maintenance and paint, making sure that construction works in progress meet the corresponding authorized projects, inspection of the \u201cecological island\u201d, vertical and slopped stone walls that may need repairs.<\/span><\/p>\n<p style=\"text-align: justify\"><span style=\"font-size: 12pt\">Cleaning of the Marina inner harbor canals, rubbish collection by foot and on patrol boats.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Road Patching: In the month of January 2018, several cobble stone and stone pavers patch works were done due to sinking and water leaks, such as in front of homes 265 and 289 at Calle Do\u00f1a Ximena, as well as at Do\u00f1a Sol in front of homes 211-C, 241 and 252; at Calle Santa Gadea [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-31","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-newsletter"],"_links":{"self":[{"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/posts\/31","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/comments?post=31"}],"version-history":[{"count":1,"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/posts\/31\/revisions"}],"predecessor-version":[{"id":619,"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/posts\/31\/revisions\/619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/media\/30"}],"wp:attachment":[{"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/media?parent=31"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/categories?post=31"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uccid.com\/en\/wp-json\/wp\/v2\/tags?post=31"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}